Prudentia Process Consulting were engaged to perform the scoping study for an ISG facility including downstream processing options for SNG. This also included tradeoff studies into alternative products such as power generation and NH3 production. This involved technology selection of eight major plant packages, and request for budget quotation (RFBQ) for 24 procurement packages. A class 5 capital cost estimate was produced, along with OPEX estimate. A risk and opportunity workshop was conducted to de-risk and optimise the project for the next phase. Further information is available on the ASX release 30th January 2017 ASX code LCK.